The latest phase of a £700,000 scheme to upgrade a stretch of the Cinder Track between two villages has been completed.
In partnership with walking and cycling charity Sustrans, North Yorkshire Council has used from the Department for Transport (DfT) to upgrade the two-and-a-half kilometre section between Burniston and Cloughton, near Scarborough.
The improvements include a new, smooth surface made from recycled materials, and widening the path, where possible. Barriers which prevented some people from accessing the track have also been removed.
The Council's executive member for highways and transport, Cllr Keane Duncan, said:
“We are very proud of the significant improvements we’ve made to this stretch of the popular Cinder Track.
“The feedback from locals and visitors alike has been extremely positive, with this major investment allowing more people than ever before to enjoy the beauty of North Yorkshire’s coast.
“We are committed to enhancing the Cinder Track further and will seek to make extra improvements in the future.”
Cllr Derek Bastiman, who represents the Scalby and the Coast division on North Yorkshire Council, added:
“The latest phase has built on our aim in making the track much more accessible to those in wheelchairs, on bicycles and for people with pushchairs.
“This section of the track now has a smooth, even surface, which provides a non-slip, free-draining path. This is a huge improvement to the previous surface, which became wet and muddy, particularly in the winter months.”
The work was carried out in partnership between the council and Sustrans, thanks to a grant of £700,000 from the DfT.
Both organisations have worked closely with the local community to develop the Cinder Track improvements. This included community drop-in events to highlight the proposed changes and gather feedback.
The director of Sustrans in the North of England, Rosslyn Colderley, said:
"The Cinder Track is one of the most scenic routes on the National Cycle Network. It links communities between Whitby and Scarborough, and is a popular path for people on foot, bike or horse.
"These improvements help to make it easier for people to use the route, which is part of our wider ambition to make the National Cycle Network accessible to everyone."
Joanne Brannan lives in Burniston with her daughter Ava-Grace, who is a wheelchair user.
She said:
“The Cinder Track was very uneven and treacherous before the improvements, and it was difficult with the wheelchair and children’s bikes.
“Since it has been improved, everyone can enjoy the walk. It is so much better now, and we feel safer from trip hazards.”
The work also forms part of the Cinder Track restoration plan that was agreed by the former Scarborough Borough Council in 2018 after consultation with the local community and track users.
More than three-quarters of those surveyed said that the route needed improving, specifically the path surface and drainage.
Improvements on the Cinder Track are part of Sustrans’ countrywide programme, supported by the DfT, to enhance the National Cycle Network and achieve their 'Paths for Everyone' vision.
The Cinder Track follows a disused railway line which has been converted into a bridleway that is used by walkers and cyclists, and stretches for 21 miles from Scarborough to Whitby.


Thousands Pack Scarborough Seafront For Town's Biggest Ever Armed Forces Day Air Show
East Riding Volunteers Catch Hundreds Of Speeders In Community Watch Scheme
Scarborough Pupils Celebrated As Health And Climate Champions
Survey Reveals Scarborough Residents Want Greater Say In Local Decisions As Whitby Cliff Lift Is Saved From Decommissioning
Scarborough Presents Biggest Armed Forces Day And Air Show
Naval Warfare Returns to Scarborough For Armed Forces Day
Scarborough & Whitby MP Hits Out at Reform MP for Linking Domestic Abuse to World Cup Results
Historic Whitby Abbey Facilities Benefit From Lift Modernisation
Spitfire Display Cancelled For Scarborough Armed Forces Day But Five Air Displays Remain
Scarborough And Whitby MP Calls For Review Of National Stroke Strategy
Scarborough Athletic Face Major Clean-Up Operation Ahead Of Sports Village Return
£450,000 Plan to Manage Coastal Erosion Near Filey Holiday Park







Comments
Add a comment